Digital X-Ray LCA simulator.
A live, deterministic 3-pillar model of one X-Ray room at Luz Saúde. Tweak the inputs, switch data-availability strategies, and watch the engine recompute — including its own confidence in the answer.
Layer A
Consumables · Short-Cycle
Layer B
Use Phase · Operational
Layer C
Capital Equipment · Long-Cycle
Per intervention
vs 320 g benchmark
Total · 1,000 scans
across the modeled period
Endpoint · DALYs
human-health burden equivalent
Data confidence
High — primary-data dominated
Live lifecycle formula
Equipment Impact per Scan
Embodied footprint
22,000 kgCO₂e
OEM EPD reference
Capital per scan
88.0 gCO₂e
÷ 250,000 scans
Use-phase energy
0.1500 kWh
45 kW × 0.00333 h
Breakdown · gCO₂e per scan
By GHG Protocol scope
Data confidence score
Framework Summary
How each lifecycle layer is computed
| Lifecycle Component | What is Calculated | Preferred Primary Data | Proxy / Top-Down Workaround |
|---|---|---|---|
| Consumables (Short-Cycle) | Mass of plastics/metals, factory sterilization, hazardous incineration. | Manufacturer BOMs, direct utility data. | Physical weighing + standard polymer database proxies (e.g., ecoinvent). |
| Use Phase (Operational) | HVAC air-changes, surgical lighting, clinical water, instrument sterilization. | Direct sub-metering of the operating room; clinic-specific logbooks. | Scaling national hospital energy benchmarks down to specific duration. |
| Capital Equipment (Long-Cycle) | Embodied manufacturing footprint divided by lifetime use + active/standby electricity. | OEM EPDs; direct power-metering of active/idle cycles. | EEIO models using purchase price; total machinery weight-to-material scaling rules. |
Consumables (Short-Cycle)
- What is calculated
- Mass of plastics/metals, factory sterilization, hazardous incineration.
- Preferred primary data
- Manufacturer BOMs, direct utility data.
- Proxy workaround
- Physical weighing + standard polymer database proxies (e.g., ecoinvent).
Use Phase (Operational)
- What is calculated
- HVAC air-changes, surgical lighting, clinical water, instrument sterilization.
- Preferred primary data
- Direct sub-metering of the operating room; clinic-specific logbooks.
- Proxy workaround
- Scaling national hospital energy benchmarks down to specific duration.
Capital Equipment (Long-Cycle)
- What is calculated
- Embodied manufacturing footprint divided by lifetime use + active/standby electricity.
- Preferred primary data
- OEM EPDs; direct power-metering of active/idle cycles.
- Proxy workaround
- EEIO models using purchase price; total machinery weight-to-material scaling rules.